Took 33 mins to cover the 19 km #YellowLine stretch from RV Road to Bommasandra. Metro was jam-packed in both directions, running at 100% capacity. Crowding this bad on Day 1 shows how urgently BMRCL needs to add more trains. #BengaluruMetropic.twitter.com/ID6agngJvp